Project Details

Premiere Logistics

Premiere Logistics

South Eastern General Contractors delivered a turnkey commercial logistics facility for Premiere Logistics — a pre-engineered metal building purpose-built for warehousing, distribution, and daily fleet operations. From site preparation and foundation through structural framing, roofing, and finished interior fit-out, SEGC managed the project end-to-end with a focus on durability, schedule, and operational efficiency.

Client

Jimmy Jack

Type

Commercial

Year

Property type

Commercial Construction

Location

Aberdeen, North Carolina

Details

Pre-engineered metal logistics facility · loading bays and yard access · single-story commercial warehouse · paved parking for fleet and staff · designed for daily distribution operations

SQFT

Pre-engineered steel framing · standing-seam metal roof · insulated metal panel walls · sealed concrete slab · commercial-grade overhead doors · paved asphalt drive lanes and parking

What We Built

A turnkey commercial logistics facility built for daily operations and long-term durability.

Scope of Work

Full general contracting from ground-break to handoff.

Site preparation, grading, and stormwater management

Foundation and slab-on-grade pour for heavy commercial loads

Pre-engineered steel framing and structural erection

Standing-seam metal roof and insulated metal panel walls

Commercial-grade overhead loading doors and personnel doors

Interior fit-out: office space, restrooms, break room

Asphalt parking lot and yard with striping for fleet operations

Built for Logistics

Designed around how the facility actually runs.

Loading bays and yard access positioned for efficient truck flow

Single-story footprint with clear-span interior for warehouse flexibility

Insulated envelope and properly sized HVAC for year-round comfort and product protection

Durable finishes selected for the wear and tear of daily distribution work

Built to North Carolina commercial code with quality and schedule managed end-to-end

Design & Function

Form follows function — a logistics building made to do the job and last.

Pre-engineered metal building chosen for clear-span flexibility and long-term cost efficiency

Loading bays positioned to keep truck traffic moving without bottlenecks

Office and breakroom areas separated from the warehouse floor for clear day-to-day workflow

Insulated metal panel walls and standing-seam roof built to North Carolina code for weather, energy, and durability

Paved drive lanes and parking sized for fleet vehicles, employees, and visitor traffic

What Sets This Build Apart

A commercial build delivered the way a custom home would be — with the owner in the loop.

Single point of contact through pre-construction, construction, and closeout

Design and material selections coordinated up-front to lock the schedule

Quality controls on every major milestone — foundation, framing, envelope, fit-out

Built around the realities of daily operations, not just blueprint specs

Delivered turnkey and ready for the first truck on day one

The Finished Facility

A commercial logistics facility that's working hard for Premiere every day.

Clean, professional exterior that represents the brand well from the road

Efficient interior layout for warehousing, fleet operations, and team workflow

Durable construction backed by SEGC's commercial track record

Delivered on schedule with clear communication every step of the way

man wearing black crew-neck shirt and black cap in front of glass wall

Jimmy Jack

I am using Southeastern for a commercial Data Center Build and despite supply chain issues and normal material construction delays they have been able to keep things moving along on the project. Communication and Documentation regarding progress has been satisfactory. Making sure we have a quality contractor to install our mission critical equipment has been a refreshing experience!

I am using Southeastern for a commercial Data Center Build and despite supply chain issues and normal material construction delays they have been able to keep things moving along on the project. Communication and Documentation regarding progress has been satisfactory. Making sure we have a quality contractor to install our mission critical equipment has been a refreshing experience!